Selected work
Six engagements, and what stayed behind.
Clients are not named. Each case gives the context, the problem, the architecture, what was built and what it changed. Where I have a measured figure it is shown, and where I don’t I say what was handed over.
01 / Automotive · National automotive distributor
842 hours of new compute, and no capacity bought
An ERP go-live sent an analytics platform running hot. The question on the table was how much capacity to buy. The answer was a schedule.
02 / Automotive · Australian automotive distributor
One analyst’s spreadsheet, rewritten as a test suite
A federal efficiency standard put a penalty-and-credit balance on every vehicle sold. The only check on the figure lived in a spreadsheet one person understood.
03 / Mining · Australian miner
The release failed in test, where it was supposed to
A production accounting model gained quarterly figures. A test on a board that reads the same tables caught the change before production did.
04 / Retail · National retailer
Every change waited on one engineer’s access
A platform team had good models and no end-to-end test. Seeing whether a change worked needed schemas dropped by the one person allowed to drop them.
05 / Manufacturing · Glass, door and window manufacturer
A quote drawn, priced and turned into an order in one place
A manufacturer prices glass by its shape and finish. The pricing rules now live in software that draws the piece, prices it, prints the quote and raises the order.
06 / Retail · Online specialist retailer
One product template, and a check that notices drift
An online store had grown its product data one product at a time. A fixed-price engagement gave it one data model, one template, and a weekly check.